Superfund Site

Cerro Metal Products Plant 1

Hwy 144(.5 Mile South Of Bellefonte), Bellefonte, PA 16823
National Priorities List: No
Status: Archived
Cerro Metal Products Plant 1 is a superfund site located at Hwy 144(.5 Mile South Of Bellefonte), Bellefonte, PA 16823. The Environmental Protection Agency (EPA) identifies sites such as Cerro Metal Products Plant 1 because they pose or had once posed a potential risk to human health and/or the environment due to contamination by one or more hazardous wastes. Cerro Metal Products Plant 1 is currently registered as an Archived superfund site by the EPA and does not require any clean up action or further investigation at this time.

Site Information For Cerro Metal Products Plant 1

Clean-Up Efforts

Preliminary Assessment
12/15/1992
Site Inspection
Completed
01/23/1996

Site Information For Cerro Metal Products Plant 1

More Superfunds in this area

What's Nearby Cerro Metal Products Plant 1?